起运港 |
提单日期 |
货重 |
货描 |
S.E ENGINEERING PRIVATE LIMITED | CHONGQING PEAK INDUSTRY CO., LTD , 6- 1 8 BUILDING | SHANGHAI | 2020-12-21 | 5.124 | 246 PACKAGES STC 1. QTY: 30,000 PCS OF INNER MOVEMENT 2. QTY: 25,000 PCS OF COIL BODY
3.QTY: 01 PC OF AUTOMATCI PLACEMENT MACHINE |
S.E ENGINEERING (PVT) LIMITED | YIWU Y.T.INTERNATIONAL LOGISTICS CO.,LTD , 1806-18 | QINGDAO | 2020-07-23 | 26.94 | STC FLEXIBLE TUBING IN ROLLS , GALVANIZED NUTS BOLTS SCREW , STRANDED INNER WIRE IN ROLLS AS PER B/L |
S.E ENGINEERING PRIVATE LIMITED. | NINGBO TONGYONG INTERNATIONAL TRADE CO.,LTD. , NO. | NINGBO | 2020-06-17 | 12.06 | PLASTIC INJECTION MOLDING MACHINE WITH ALL STD ACCESSORIES AND EQUIPMENTS ETC (CY/CY) |
S.E ENGINEERING PRIVATE LIMITED | CHONGQING PEAK INDUSTRY CO., LTD , NO6-18 BUILDING | SHANGHAI | 2020-06-11 | 2.615 | 100 CARTONS STC SPARE PARTS FOR MOTORCYCLE METER INNER MOVEMENT |
S.E ENGINEERING PVT LTD | CHONGQING PEAK MECHANICAL CO , LTD | XINGANG | 2019-12-14 | 24.617 | QTY:46,000 SETS OF CABLE PARTS IN CKD |
S.E ENGINEERING PVT LTD | CHONGQING PEAK MECHANICAL CO , LTD | TIANJINXINGA NG | 2019-09-06 | 24.598 | STC 46000 SETS OF CABLE PARTS IN CKD |
S.E ENGINEERING PVT LTD | CHONGQING PEAK MECHANICAL CO , LTD | XINGANG | 2019-04-27 | 24.385 | CABLE PARTS IN CKD |
S.E ENGINEERING PVT LTD | CHONGQING PEAK MECHANICAL CO , LTD | XINGANG | 2019-01-19 | 24.385 | CABLE PARTS IN CKD |